| S.No. | Client | Project Title | Agreement No | Contractor/Sub-Contractor | Year | Status |
|---|---|---|---|---|---|---|
| 1 | K-Electric | Survey, Design, Engineering, Manufacture, Supply, Construction, Installation, Erection, Testing, Commissioning, Energization and Handing over on Turnkey basis of 220kV Overhead & Underground T/L for 220kV Dhabeji Grid Station |
Contract Agreement | Contractor | 2021 | In Hand |
| 2 | TP 1000-01 | Civil work and Tower/ Pole erection for location T036-050 of FWP01-1 New Port Qasim to KDA transmission line FWP01-2 New Port Qasim GS to Power Plant Transmission line |
PO/FW-1/Lst/331/001 | Sub-Contractor | 2021 | In Hand |
| 3 | PAEC | Survey, Geotechnical Study, Design, Engineering, Manufacture, Supply, Laying, Construction, Instalaltion, Erection, Testing, Commissioning, Energization And Handing Over On Turnkey Basis A New 132 Kv Double Circuit Transmission Line (Permanent Arrangement) From K-Electric 132 Kv Baldia Grid Station K2-K3 Gantry (On Trunkey Basis) | K2/K2-PD(132 KV)/02/2021/337 | Contractor | 2021 | In Hand |
| 4 | DESCON | Construction Of Spaira Ragha Canal Pump House At Kurram Tangi Multi Purpose Dam Proj Stage-I |
Sub-Contractor | 2021 | In Hand | |
| 5 | K-Electric | Painting of OHTLs structures of 132kV KDA-Johar-Hospital-Gulshan. |
Contractor | 2021 | In Hand | |
| 6 | CEEC NEPC-II | 500kV Double Circuit Quad Bundle Transmission Line from Suki Kinari Hydro Power Station to Interconnection Point of Existing Neelum Jhelum 500kV Double Circuit Quad Bundle Transmission Line (approx. 75km). using ACSR "Bunting" Conductor (Section-I) |
Sub-Contractor | 2022 | In Hand | |
| 7 | K-Electric | Services Against Govt. Project Regarding Road Rehabilitation from Gulbai to Mauripur. |
Contractor | 2023 | In Hand | |
| 8 | K-Electric | Rehabilitation- of OHTL Structures (Tower/Monopole/Gantry/PLDP). |
Contractor | 2023 | In Hand | |
| 9 | K-Electric | Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Erection, Testing, Commissioning, Energization and Handing over on Turnkey basis of 132kV S/C Transmission Line from KDA Grid Station to Memon Goth Grid Station with Loop-in & Loop-out arrangement at Askari-VI Grid Station. The transmi |
Sub-Contractor | 2026 | In Hand | |
| 10 | K-Electric | REHAB OF FOUNDATION & STUB-FY25-AMK | Contractor | 2026 | In Hand | |
| 11 | K-Electric | Comp Ins+HF GulHospital | Contractor | 2026 | In Hand | |
| 12 | K-Electric | Rehab of Foundation and Stub-FY25-AMQ | Contractor | 2026 | In Hand | |
| 13 | K-Electric | Comp Ins+HF 132kV PW-RECP (Services) | Contractor | 2026 | In Hand | |
| 14 | K-Electric | Comp Ins+HF RECP-GHARO (119-GHARO) | Contractor | 2026 | In Hand | |
| 15 | K-Electric | Procurement of Rehab Services for PSM | Contractor | 2026 | In Hand | |
| 16 | NTDC | "Construction and Completion of Civil Works, Erection, Stringing, Testing & Commissioning of 500kV Double Circuit Quad Bundle Transmission Line from 500kV Maira Switching Station to 500kV Islamabad West Substation (approx. 131km) and 500kV Double Circuit Transmission Line from Maira Switching Station to Karot Switchyard (20km app | Contractor | 2026 | In Hand | |
| 17 | NTDC | TENDER NO. TLC-18-2024: CONSTRUCTION AND COMPLETION OF CIVIL WORKS, ERECTION, STRINGING, TESTING & COMMISSIONING OF 500KV D/C QUAD BUNDLE TRANSMISSION LINE FROM SANGAL TO 500KV MAIRA SWITCHING STATION (APPROX. 83.5 KM), USING ACSR “BUNTING” CONDUCTOR (Lot-II: 23.5kM Approx) | Contractor | 2026 | In Hand |