| S.No. | Client | Project Title | Agreement No | Contractor/Sub-Contractor | Year | Status |
|---|---|---|---|---|---|---|
| 1 | NTDC | Civil Work, Erection Stringing, Testing & Commissioning of 500Kv D/C Quaid bundle Transmission Line from HUBCO Power Plant To Existing 500kV Jamshoro Grid Station |
CPP-04C-2017 (LOT- II) | Sub-Contractor | 2020 | Completed |
| 2 | K-Electric | Procurement of Damper; Vibration for TMOH | 7500040344 | Contractor | 2020 | Completed |
| 3 | K-Electric | Survey, Design, Engineering, Manufacture, Supply, Erection of connectors for Hub-Tapal-Baldia Circuits. | 7500041934 | Contractor | 2020 | Completed |
| 4 | K-Electric | Services for replacement of existing Insulator string by composite insulator String (KTPS-PRL) | 7500039943 | Contractor | 2020 | Completed |
| 5 | K-Electric | Procurement of RCC Structure on 132KV Hub-Vindar and 66KV Vinder-Uthal-Bela OHTL. | Contractor | 2020 | Completed | |
| 6 | China Electric Power Equipment & Technology CO., Ltd. | 660kV HVDC Project from Matiari to Lahore Transmission Line Lot-II | Contractor | 2020 | Completed | |
| 7 | K-Electric | Supply of Name Plate, Danger Plate | Contractor | 2020 | Completed | |
| 8 | K-Electric | Procurement of Damper; Spacer for TMOH |
Contractor | 2020 | Completed | |
| 9 | K-Electric | Supply Services Monopole Step Ladders and Step bolts on 220 |
Contractor | 2020 | Completed | |
| 10 | K-Electric | Service Contract for OPGW / FOC Maintenance Contract of KE Telecom Fiber Optic
|
Contractor | 2020 | Completed | |
| 11 | LSN & Sean Consortium KOREA/NTDC | 132 Kv Overhead Transmission Line Larkana - Dadu - Mehar (Sindh) Hesco 08 |
HESCO 08 | Sub-Contractor | 2021 | Completed |
| 12 | K-Electric | Procurement of sevices installation of OPGW PIP-RECP-GHARO-OURSUN | 7500040421 | Contractor | 2021 | Completed |
| 13 | K-Electric | Service contract for OPGW/FOC Maintainence contract of KE Telecon Fiber Optic Network. |
4410001880 | Contractor | 2021 | Completed |
| 14 | K-Electric | Services Required for laying of OPGW splicing Installation and testing |
7500044171 | Contractor | 2021 | Completed |
| 15 | K-Electric | Procurement of services for replacement of Disc Insulators for KDA-NKI-Baldia-Surjani |
7500042097 | Contractor | 2021 | Completed |
| 16 | Shandong Electric Power Engineering Consulting Institute Corp., Ltd | Lott-III Section-II 220KV STD Twin Bundle Transmission Line From T- Point to UCH |
Sub-Contractor | 2021 | Completed | |
| 17 | K-Electric | Painting of OHTLs of 132kV Queens road-Clifton-Gizri |
7500042584 | Contractor | 2021 | Completed |
| 18 | K-Electric | Painting of OHTLs structures of 132kV Fed.B-Valika-Surjani-Maymar |
7500042604 | Contractor | 2021 | Completed |
| 19 | K-Electric | Painting of OHTLs structures of 132kV Pipri-K.Town-KEPZ-Landhi |
7500042605 | Contractor | 2021 | Completed |
| 20 | K-Electric | Material and Service for Rehabilitation 132KV OHTL Tower under Encroached Area Landhi-Gul Ahmed. |
7500042177 | Contractor | 2021 | Completed |
| 21 | Siemens | Installation & Testing Work At NPQ Station | 4510361543 | Contractor | 2021 | Completed |
| 22 | Harbin Electric | 900 MW BQPS-111 COMBINED CYCLE PLANT & ASSOCIATED TRANSMISSION PROJECTS | 1800113-010207-301-B18 | Contractor | 2021 | Completed |
| 23 | K-Electric | OPGW Laying (32 KM ) Splicing & Tasting | 7500039784 | Contractor | 2021 | Completed |
| 24 | K-Electric | Installation/Splicing and Testing of OPGW at Different Circuits |
7500047214 | Contractor | 2022 | Completed |
| 25 | K-Electric | Services of Replacement of Old/deterioriated Insulator Strings with hardware fittings on 220kV BQPS - KCR Ckt I & II (5th Phase) | 7500042231 26-06-2022 | Contractor | 2022 | Completed |
| 26 | K-Electric | Replacement of Composite Insulators with complete hardware fittings including armor rods and grading-corona rings etc for TMOH |
7500048642 (08-11-22) | Contractor | 2022 | Completed |
| 27 | K-Electric | PROCUREMENT OF SERVICES FOR RELOCATION OF TELECOM OUTDOOR EQUIPMENT | 7500044768 | Contractor | 2022 | Completed |
| 28 | Pakistan Services Limited | Construction of Gabion Walls & Stone Pitching at Pearl Continenal Hotel Mirpur |
Sub-Contractor | 2022 | Completed | |
| 29 | DHA Peshawar | Execution of Underground Electrification, Works for HT/LT System DHA Peshwar |
Contractor | 2022 | Completed | |
| 30 | K-Electric | Services required for the installation-replacement of existing Insulators and STACIR- |
7500049184 (10-11-22) | Contractor | 2023 | Completed |
| 31 | K-Electric | Services required for the installation-replacement of existing insulators and STACIR 132kV Pipri-Korangi Town, 132kV Landhi-Gul Ahmed, 132 kV Gul Ahmed-Korangi Town |
Contractor | 2023 | Completed | |
| 32 | K-Electric | Services are required for the installation, replacement of existing Insulator Strings by composite type Long Rod Insulator strings with complete hardware fittings on both circuits of 132kV Baldia-KANUPP and 132kv Baldia-K2/K3 Circuit, complete in all respects as per the KE requirements from Loe. 21 to 49 =Total 31 locations |
Contractor | 2023 | Completed | |
| 33 | K-Electric | Permanent solution regarding Restoration of collapsed T# 51 of 132kV Baldia-Tapal and Tapal-Hub due to flooding/heavy rainfall. |
Contractor | 2023 | Completed | |
| 34 | FWO | Kurram Tangi Dam Project, North Waziristan, Civil, Electrical And Mechanical Work |
Sub-Contractor | 2024 | Completed | |
| 35 | K-Electric | Survey, Design, Engineering, Manufacture, Supply, Construction, Installation, Erection, Testing, Commissioning, Energization and Handing over on Turnkey basis of 220kV Overhead & Underground T/L for 220kV Dhabeji Grid Station |
Contractor | 2024 | Completed | |
| 36 | K-Electric | Rehabilitaion of OHTL Structures (Tower/Monopole/Gantry/PLDP) (CRO Rehab Works) |
Contractor | 2024 | Completed | |
| 37 | K-Electric | Hirring of Services for OPGW-FOC Maintenance Contract | Contractor | 2024 | Completed | |
| 38 | K-Electric | Replacement of Composite Insulators with complete hardware fittings including armor rods and grading-corona rings etc for TMOH | Contractor | 2024 | Completed | |
| 39 | K-Electric | Rehabilitation of 220kV BQPS- KCR I, II -TMOH (Replacmement of conductor) | Contractor | 2024 | Completed | |
| 40 | K-Electric | Hirring Services for KE HT Infrastructure Diversion 132KV GAEL to Airport and Korangi Town to Baloch. MEW Phase 2 Extension |
Contractor | 2024 | Completed | |
| 41 | K-Electric | Services for Cleaning of Line insulators on 220KV BQPS - KCR1, 2 & 3 Wind corridor. |
Contractor | 2024 | Completed | |
| 42 | K-Electric | Services for KE HT Infrastructure Diversion 132KV MEW TMOH | Contractor | 2024 | Completed | |
| 43 | K-Electric | Rehablitation / Replacement of Damaged Tilled Tower by 52ft pole of 132KV | Contractor | 2024 | Completed | |
| 44 | K-Electric | Hiring Of Work Of "Services" Of Rehabilitation/Replacement Of Insulator Strings Conductor On Yellow Phase Of 132kv TPP-1 Transmission Line Of K-Electric. | Contractor | 2024 | Completed | |
| 45 | K-Electric | Our team successfully rehabilitated the 220kV transmission towers #42-47 CCPP-KCR, ensuring reliable power transmission and safety. |
Sub-Contractor | 2025 | Completed | |
| 46 | PAEC | Survey, Geotechnical Study, Design, Engineering, Manufacture, Supply, Laying, Construction, Instalaltion, Erection, Testing, Commissioning, Energization And Handing Over On Turnkey Basis A New 132 Kv Double Circuit Transmission Line (Permanent Arrangement) From K-Electric 132 Kv Baldia Grid Station K2-K3 Gantry (On Trunkey |
Contractor | 2025 | Completed | |
| 47 | NTDC | Procurement of Plant - Design, Manufacture, Supply, Instalaltion, Testing & Commissioning of 500kV Double Circuit Quad Bundle Trasnmission Line from Suki Kinari Hydro Power Station to Interconnection Point of Existing Neelum Jhelum 500kV Double Circuit Quad Bundle Trasnmission Line (approx. 75km), using ACSR "Bunti |
Contractor | 2025 | Completed | |
| 48 | NTDC/ China Electric Power Equipment and Technology Co Ltd | 500kV/ 220kV/ 132 kV Lahore North Substation & Extension Works at 500kV/ 220kV/ 132 kV Nokhar Substation Project (Lot B) + Lot C + Lot D + Lot G + Escalation Lot B & Escalation Lot C + Safety Lot B & Safety Lot C | Contractor | 2025 | Completed | |
| 49 | Shanghai Electric | Civil work and Tower/ Pole erection Stringing FWP01-1 New Port Qasim to KDA transmission Line | Contractor | 2025 | Completed | |
| 50 | K-Electric | Rehabilitation of Tower Foundation and Stub on multiple KE TLs location | Contractor | 2025 | Completed | |
| 51 | K-Electric | Procurement Of Services For The Protection Of EHT Cables Inside Nala For Qayyumabad Region. | Contractor | 2025 | Completed | |
| 52 | K-Electric | MEW Phase 04 Extension | Contractor | 2025 | Completed | |
| 53 | K-Electric | Composit Insulator+ HF 132kV PW-BOC (Services) | Contractor | 2025 | Completed | |
| 54 | K-Electric | Contract for OPGW Services | Contractor | 2025 | Completed | |
| 55 | Lotte Chemical | To carry out replacement of 220 kV Transmission Line OPGW-- |
Sub-Contractor | 2025 | Completed | |
| 56 | K-Electric | KDA-Bal-NKI-Sur Ins Replacement PhaseIII | Contractor | 2025 | Completed | |
| 57 | K-Electric | SERVICES FOR DIV OF 220KV BL KKI 1 &2 | Contractor | 2025 | Completed | |
| 58 | K-Electric | 220kV NPQ- KDA I, II T#82A-83A(UC 1-1) MEW Phase 5 | Contractor | 2025 | Completed | |
| 59 | K-Electric | REHAB. SERVICES FOR PSM |
Contractor | 2025 | Completed |